Mechanical Walkthrough
(March 29, 2003)

We met with the construction supervisor to verify that everything that we specified in the electrical walkthrough was installed properly and that all other structural items were correctly in place before they started hanging the dry wall. 

bullet

Insulation blown in the walls

bullet

More insulation, start on dry walling

bullet

Basement floor concrete was poured, Sump Pump installed.

bullet

Wiring box in the basement.