Mechanical
Walkthrough
(March 29, 2003)
We met with the construction supervisor to verify that everything that we specified in the electrical walkthrough was installed properly and that all other structural items were correctly in place before they started hanging the dry wall.
![]() |
|
![]() |
|
![]() |
|
![]() |
|